Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Middle row seats19 Rear seats20 Interior trim21 Electrical - general22 Starting and charging23 Wiring harnesses24 Instruments and warning lamps25 Locking, alarm and airbags26 Electrical - driver assistance systems27 Heating, air conditioning and audio
Citroën Jumpy III Factory Workshop Manual (2007-2016)01 · Engine
01 · Engine

Removing - Refitting: timing belt (DV6UC/DV6DU)

Make
Citroën
Model
Jumpy III Factory Workshop Manual
Year
2007–2016
Section
Timing gear › Removing - Refitting: timing belt (DV6UC/DV6DU)
EngineRemoving - Refitting: timing belt (DV6UC/DV6DU)

Removing - Refitting: timing belt (DV6UC/DV6DU)

Citroën Jumpy III · Removal-fitting · Ref. B1EG013CP0

Applies to: 1.6 HDi (DV6UC) or 1.6 HDi 90 (DV6DU)

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Tooling

Equipment: Trolley jack.

toolReferenceDesignation
Figure e5ab08rt
[0194-B]Camshaft probe
Figure e5ab08qt
[0194-A] (x2)crankshaft setting rod
High pressure fuel pump drive pulley immobilising rod
Figure e5ab05lt
[0194-T]plugs kit
Figure e5ab0b7t
[0194-W]flywheel stop

2. Removing

ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.

ESSENTIAL: Deactivate the pneumatic suspension before lifting the vehicle (2 or 4 post lift, workshop jack or customer’s jack).

Put the vehicle on a hoist.

Disconnect the battery.

Remove the engine style cover (According to equipment).

Uncouple and move aside the fuel supply and return pipes; Close using tool [0194-T].

Remove:

Figure b1bg2x9d

Insert the flywheel stop [0194-W] (At "a" and "b").

Tighten the bolt (1).

Remove: The pulley cover (According to equipment).

Turn the engine in the normal direction of rotation until the flywheel is immobilised.

Figure b1bg2xad

Unclip: The electrical harness alongside the timing covers.

Release and move aside the electrical harness (2).

Disconnect the connector of the engine speed sensor.

Release and move aside the electrical harness (7).

Remove:

  • The top timing cover (3)
  • The (4) bolt
  • The pulley (5)

N.B.: To make it easier to remove the lower timing cover (6); Move the accessories drive belt dynamic tensioner roller   (at "c").

Remove the lower timing cover (6).

Refit bolt (4).

Remove the tool [0194-W].

Figure b1eg0v9d

CAUTION: The crankshaft pulley magnetic track must not bear any signs of damage and must be kept away from all magnetic sources; Otherwise, replace the crankshaft pulley.

Remove:

  • The engine speed sensor (8)
  • The offset prevention angle bracket (9)

Turn the crankshaft by means of the screw (4) to bring the camshaft to its pegging point.

Peg:

  • The camshaft; Using tool [0194-B]   (oil the peg)
  • The high pressure fuel pump drive pulley; Using tool [0194-A]   (oil the peg)
  • The crankshaft; Using tool [0194-A]
Figure b1bg2xbd

Place a trolley jack fitted with a soft pad under the engine oil sump.

N.B.: The trolley jack must be able to support the engine-gearbox assembly.

Remove:

  • The 2 bolts (10)
  • The 3 bolts (11)
  • The nut (12)
  • All of the flexible engine mountings (13)
Figure b1bg2xcd

Remove:

  • The bolts (16)
  • The intermediate engine mounting (15)

CAUTION: Support the dynamic roller tensioner; Using a 6 -sided wrench   (at "d").

Slacken the bolt (17).

Slacken the timing belt (14) by pivoting the dynamic roller tensioner clockwise.

Remove the timing belt (14) starting with the coolant pump pulley.

3. Check

CAUTION: Just prior to refitting, carry out the checks below.

Check that the coolant pump rollers and pulley are turning freely (without excess play and without tightness).

Check the absence of oil leaks (crankshaft and camshaft sealing rings).

Check the absence of coolant fluid leaks   (coolant pump).

Check that the engine speed sensor target track (8) is not damaged or scratched.

N.B.: Replace any defective parts.

4. Refitting

CAUTION: Adhere to the tightening torques.

For: 1.6 HDi 90 (DV6DU)

Tightening torques:

For: 1.6 HDi (DV6UC)

Tightening torques:

Figure b1eg0y7d

Check the tightening of the guide roller (19).

Fit the timing belt (14) on the crankshaft pulley.

The bolt with the washer "e":

  • The tensioning roller (19)
  • The camshaft pulley (18)
  • The high pressure fuel pump pulley (22)
  • The coolant pump pulley (20)
  • The dynamic roller tensioner (21)

Refit:

  • The offset prevention angle bracket (9)
  • The engine speed sensor (8)

4.1. Adjusting the timing belt tension

Figure b1eg0y8d

Bring the index "g" into the centre of a gap "f" by turning the dynamic tensioner roller (21) anticlockwise; Using a 6 -sided wrench   (at "d").

Tighten the bolt (17).

CAUTION: The dynamic roller tensioner (21) index "g" must be centred in the gap "f".

Remove the tools [[0194-B] - [0194-A] - [0194-A]].

Refit:

  • The intermediate engine mounting (15)
  • The bolts (16)
  • All of the flexible engine mountings (13)
  • The nut (12)
  • The 3 bolts (11)
  • The 2 bolts (10)

Remove the trolley jack.

CAUTION: Do not turn the engine anti clockwise.

Turn the crankshaft by 6 rotations clockwise.

Fit the crankshaft setting rod; Using tool [0194-A].

Check the positioning of the index   (at "g").

N.B.: The dynamic roller tensioner (21) index "g" must be centred in the gap "f".

CAUTION: If it does, repeat the timing belt tensioning operation.

Pin the camshaft pulley; Using tool [0194-B].

Peg the fuel high pressure pump drive pulley; Using tool [0194-A].

CAUTION: If it is impossible to peg the camshaft, check that the offset between the camshaft pulley hole and the pegging hole is not greater than 1 mm. In the event of an incorrect measurement, start the procedure again.

Remove the tools [0194-B] - [0194-A] - [0194-A].

4.2. Subsequent operations

Figure b1bg2xad

Refit the tool [0194-W].

Remove the bolt (4).

N.B.: To make it easier to refit the lower timing cover (6); Move the accessories drive belt dynamic tensioner roller   (at "c").

Refit:

  • The lower timing cover (6)
  • The pulley (5)
  • The bolt (4)   (new)

Remove the tool [0194-W].

Couple up: The exhaust front flexible pipe   (if necessary).

Reconnect the engine speed sensor (8) connector.

Clip the electrical harness attached to the timing covers.

Clip the electrical harness (7).

Refit the pulley cover (According to equipment).

Refit:

N.B.: Use new plastic clips.

Clip the electrical harness attached to the timing covers.

Clip the electrical harness (2).

Remove the tool [0194-T].

Connect the fuel supply and return pipes.

Refit:

For: 1.6 HDi (DV6UC) or 1.6 HDi 90 (DV6DU)

Tighten the wheel bolts.

Tighten the wheel bolts.

CAUTION: Perform the operations to be carried out following reconnection of the battery.

Reconnect the battery.

Operate the manual priming pump several times to prime the fuel circuit.

Refit the engine style cover (According to equipment).

5. Check

Start the engine.

Check the absence of leaks.

Parts & tools for this job For 2007 Citroën Jumpy

As an Amazon Associate we earn from qualifying purchases.