Removal - refitting: Cylinder head
- Make
- Citroën
- Model
- Nemo Multispace Factory Workshop Manual
- Year
- 2008–2017
- Section
- Cylinder head › Removal - refitting: Cylinder head
Removal - refitting: Cylinder head
ESSENTIAL: Observe the safety and cleanliness instructions.
1. Tooling
| Reference | Description | Reference | Reference |
|---|---|---|---|
| [1] | liner retaining clamp | (-).0132-A1Z | |
| [2] | Bolt(s) M10 X 150 | (-).0132-A3Z | |
| [3] | Camshaft pulley setting rod | (-).0132-RZ | 7018-T.Y |
| [4] | [] cylinder head releasing levers | (-).0153-Q | |
| [5] | [] flywheel setting rod | (-).0132-QY | |
[6] Cylinder head bolt socket TORX STX 14.
[7] Spanner for adjusting of valve rockers on (-).0130.A engines.
| Reference | Description | Reference | Reference |
|---|---|---|---|
| [8] | Adapter for angular tightening | FACOM D.360 | 4069-T |
2. Removal
ESSENTIAL: Wait at least one hour before carrying out any work on the exhaust line.
Disconnect the ancillaries battery.
Place the vehicle on a lift.
Take down:
- The front right-hand wheel
- The splash shield
- The air filter housing
- The ancillary drive belt ()
- The timing belt
- The catalytic converter
Disconnect the connector (at "a").
Unclip the oil breather pipe (1) (at "b").
Remove the crankcase breather hoses (1).
Disconnect the connectors (at "c", "d", "e", "g", "h").
Unclip the electric harness (at "f").
Move aside the electrical harness.
Take down:
- The nuts (2)
- The cylinder head cover (3)
- The spacers (4)
- The deflector plate (5)
Take down:
- The nuts (7)
- The ignition coil (6)
- The bolt (8)
Uncouple:
- The fuel supply pipe (at "k")
- The vacuum pipe (at "j")
Take down:
- The bolts (11)
- The bracket (10)
- The thermostat (9)
Starting at the outside and working in a spiral sequence progressively slacken the cylinder head bolts (13).
Take down:
- The cylinder head bolts (13); Using the tool [6]
- The rocker shaft (12)
CAUTION: Avoid knocks to the rocker bearings when the rail is handled.
Rock and free the cylinder head using levers [4].
Remove the cylinder head and gasket.
Clean the cylinder head bolt threads in the cylinder block using a tap (M10 X 150).
Clean the joint faces with an approved descaling product.
Fit the liner retaining clamps [1] and bolts [2].
CAUTION: The joint faces must not have any trace of knocks or scores. Do not use abrasives or sharp tools on the joint faces.
3. Refitting
3.1. Checking the flatness
Maximum permissible bow = 0,05 mm.
3.2. Checking cylinder head bolts before re-use
"Y" Maximum length below head = 176,5 mm.
CAUTION: Do not re-use cylinder head bolts if they are longer than 176,5 mm.
3.3. Refitting (Continued)
Check that the 2 centralising studs are present (14).
Remove the liner retaining clamps [1].
3.4. Checking the protrusion of the liners in relation to the cylinder block
At three points, check the protrusion of each liner in relation to the cylinder block.
CAUTION: Fit a new cylinder head gasket, with the maker’s name to the top.
Fit the cylinder head, with the camshaft pulley pegged; Using the pin [3].
ESSENTIAL: Avoid touching the roller rocker tracks; Apply a light film of clean engine oil to the bearing tracks and to the rocker shaft when the rail is fitted (Check that there is no hard spot on the rocker bearings).
Check that the camshaft turns freely in its bearings.
Fit:
- The rocker shaft (12)
- The cylinder head bolts (13) pre-coated with engine oil
CAUTION: Tighten the cylinder head bolts in the order shown (1 to 10).
Tightening procedure: Cylinder head fixing bolt (12):
- Pre-tightening to 2 ± 0,2 daN.m
- Angular tightening to 240 ± 5 °; Using the tool [8]
Remove the tool [3].
Fit:
3.5. Rocker adjustment
Adjust the valve clearances; Using the tool [7].
Valve clearances cold:
- Inlet valve: 0,20 ± 0,05 mm
- Exhaust valve: 0,40 ± 0,05 mm
3.6. Refitting (Continued)
Fit:
- The deflector plate (5)
- The spacers (4)
- The cylinder head cover (3)
- The nuts (2); Tighten to 0,7 ± 0,1 daN.m
- The thermostat 9
- The bracket (10)
- The bolts (11)
Recouple:
- The vacuum pipe (at "j")
- The fuel supply pipe (at "k")
Fit:
- The bolt (8)
- The ignition coil (6)
- The nuts (7)
Clip the electrical harness (at "f").
Connect the connectors (at "c", "d", "e", "g", "h").
Reclip the oil vapour resuction pipe (1) (at "b").
Connect the connector (at "a").
Carry out filling and bleeding of the coolant circuit and top up the level.
Fit:
- The catalytic converter
- The air filter housing
- The splash shield
- The front right-hand wheel
CAUTION: Perform the operations that are required following a reconnection of the ancillaries battery.
Reconnect the ancillaries battery.
Parts & tools for this job For 2008 Citroën Nemo
- PARTEngine gasket setSearch: Citroën Nemo 2008 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.