Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Electrical - general19 Starting and charging20 Wiring harnesses21 Locking, alarm and airbags22 Electrical - driver assistance systems23 Heating, air conditioning and audio
Citroën Nemo Van Factory Workshop Manual (2008-2017)01 · Engine
01 · Engine

Removing - Refitting: EGR module

Make
Citroën
Model
Nemo Van Factory Workshop Manual
Year
2008–2017
Section
Emission control › Removing - Refitting: EGR module
EngineRemoving - Refitting: EGR module

Removing - Refitting: EGR module

Citroën Nemo Van · Removal-fitting · Ref. B1KG015FP0

Applies to: C510 manual gearbox and 1.3 HDi 75 or C510 piloted manual gearbox and 1.3 HDi 75

ESSENTIAL: Observe the safety and cleanliness instructions.

1. Tooling

Equipment: 1 Strap.

ToolReferenceDescription
Figure e5ai00dt
[0172-Z]Pliers for removing CLIC clips
Figure e5ab06it
[0188-T]Set of plugs

2. Removing

Place the vehicle on a lift.

Disconnect the battery.

Drain the engine cooling circuit.

Figure b1kg09rd

CAUTION: Plug the click-fit unions; Using the tool [0188-T].

Disconnect the snap fixing at the vacuum pump (In "a").

Remove:

  • The inlet air metering unit
  • The bolt (1)
Figure b1kg09ud

Remove:

  • The bolt (5)
  • The support (6) for the inlet air metering unit
  • The screws (3), (4)
  • The exhaust gas recycling pipe (2) (Retrieve the seals)
Figure b1kg09vd

Uncouple the pipe (7).

Figure b1kg09wd

Remove:

  • The exhaust line
  • The starter motor

Disconnect the connectors (8), (9).

Unclip the electrical harness (In "c").

Uncouple the vacuum pipe (10) (In "b").

Figure b1kg09xd

Remove bolts (11).

Tilt the engine-gearbox assembly (In the direction of the arrow).

Strap the engine-gearbox assembly to the vehicle chassis; Using a strap ().

Figure b1kg09yd

Remove:

  • The screws (12)
  • The exhaust gas recycling module (13) (Carefully) (From below the vehicle)

Retrieve the seals.

Figure b1kg09zd

Remove (On the bench):

  • The clip (14); Using the tool [0172-Z]
  • The pipe (7)
  • The screws (16)
  • The EGR valve (15) (Retrieve the seals)
Figure b1kg0a0d

Uncouple: The exhaust gas recycling (EGR) regulation electrovalve (17) (In "d").

Remove (On the bench):

  • The screws (18)
  • The exhaust gas recycling (EGR) regulation electrovalve (17)

3. Refitting

3.1. Preparation

Clean the seal faces of the EGR module, using a special degreaser index 24.

Figure b1kg0aud

CAUTION: When positioning the seal faces (20), (23), pay particular attention to the retaining studs (risk of leaks).

Fit: The seals (19), (20), (21), (22), (23)   (new).

Lubricate the seal (19)   (with engine oil).

3.2. Subsequent operations

CAUTION: Observe the tightening torque values.

Tightening torques:

Fit (On the bench):

  • The exhaust gas recycling (EGR) regulation electrovalve (17)
  • The screws (18)

Recouple: The exhaust gas recycling (EGR) regulation electrovalve (17) (In "d").

CAUTION: Take care to position the seal (21) correctly right into the well of the EGR module (13).

Position (On the bench):

  • Seal (20) (New) (On the EGR valve (15))
  • Seal (21) (New) (In the well of the EGR module (13))

Fit (On the bench):

  • The EGR valve (15) on the EGR module (13)
  • The screws (16)
  • The pipe (7)
  • The clip (14); Using the tool [0172-Z]

Fit:

  • Seal (22) (New)
  • The exhaust gas recycling module (13) (Carefully) (From below the vehicle)
  • The screws (12)

Remove the strap.

Refit the bolts (11).

Recouple: The vacuum pipe (10) (In "b").

Clip: The electrical harness (In "c").

Connect the connectors (8), (9).

Fit:

  • The starter motor
  • The exhaust line

Connect the hose (7).

Fit:

  • The seals (19), (23)   (new)   On the exhaust gas recycling pipe (2)
  • The exhaust gas recycling pipe (2)
  • The screws (3) and (4)
  • The support (6) for the inlet air metering unit
  • The bolt (5)
  • The bolt (1)
  • The inlet air metering unit

Remove the tool [0188-T].

Couple the vacuum pump unions (In "a").

Fill and bleed the cooling system.

CAUTION: Perform the operations to be carried out following reconnection of the battery.

Reconnect the battery.

4. Checks

Start the engine.

Check:

  • The absence of leaks
  • The operation of the EGR regulation electrovalve (17); Using the diagnostic tool

Using the diagnostic equipment: Perform an initialisation of the EGR valve (15).

Parts & tools for this job For 2008 Citroën Nemo

As an Amazon Associate we earn from qualifying purchases.