Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Electrical - general20 Starting and charging21 Instruments and warning lamps22 Locking, alarm and airbags23 Heating, air conditioning and audio
Citroën Xantia II Factory Workshop Manual (1998-2001)01 · Engine
01 · Engine

Removing - refitting: Cylinder head (DW10TD)

Make
Citroën
Model
Xantia II Factory Workshop Manual
Year
1998–2001
Section
Cylinder head › Removing - refitting: Cylinder head (DW10TD)
EngineRemoving - refitting: Cylinder head (DW10TD)

Removing - refitting: Cylinder head (DW10TD)

Citroën Xantia II · Removal-fitting · Ref. B1DG2RP0

Applies to: 2.0 HDi 90

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Recommended tools

Figure e5-p05ec

[1] lifting bracket 2517-T.Bis.

Figure e5ap051c

[2] set of levers for releasing the cylinder head 0149-T.

Figure e5-p160c

[3] toothed belt pinion locking tool 6016-T.

Figure e5ap17sc

[4] plugs kit (-).0188 T.

Figure e5-p04uc

[5] adaptor for angular tightening 4069-T.

2. Removing

Disconnect the battery negative terminal.

Drain:

  • The cooling system
  • The gearbox

Remove:

  • The style cover
  • The turbocharger (see the relevant operation)
  • The accessories drive belt (see the relevant operation)
  • The timing belt (see the relevant operation)

Refit the right-hand engine mounting.

Figure b1bp20fc

Remove:

  • The right cover mounting (3)
  • The upper cylinder head cover (4)

Disconnect and release the electrical supplies to the cylinder head.

Uncouple and move aside the following parts from the cylinder head:

  • The coolant hose
  • The fuel supply pipe (1)
  • The fuel return pipe (2)
Figure b1bp20gc

Disconnect the connector (7).

Remove:

  • The air cleaner (8)
  • The fixing (6)
  • The pipe (5)
  • The EGR valve (see the relevant operation)

ESSENTIAL: Clean the high pressure unions before slackening (see the relevant operation).

Lock the unions remaining in place on loosening to prevent any movement.

Remove:

  • The injector high pressure harness
  • The high pressure supply pipe (between the pump and the high pressure fuel common injection rail)

ESSENTIAL: Plug the orifices when uncoupling a pipe Using tool [4].

Figure b1gp07bd

Disconnect the connectors (13).

Remove:

  • The bracket (11)
  • The oil gauge guide fixing
  • The fixings (10) of the coolant outlet housing
  • The studs (12)

Move the water outlet housing (9) away from the cylinder block.

Install a workshop crane.

Place the engine in a sling Using tool [1].

Tension the equipment 1.

Remove the right-hand engine mounting.

Figure b1ep139c

Remove the screws (14) and (15).

Refit the right-hand engine mounting.

Figure b1dp14sc

CAUTION: Proceed bolt by bolt in the order shown.

Remove the cylinder head bolts (order from 1 to 10).

Remove:

  • The cylinder head Using tool [2] (if necessary)
  • The cylinder head gasket

3. Cleaning to be carried out just before refitting

CAUTION: Clean the gasket faces with an approved descaling product. Do not use a cutting or abrasive tool. The gasket faces must not have any traces of knocks or scores.

Clean the tappings with the help of a suitable tap.

Brush clean the threads of the bolts.

4. Check

ESSENTIAL: Just prior to refitting, carry out the checks below.

Check the flatness of the cylinder head: Maximum permissible bow = 0,03 mm.

Check the length of the cylinder head bolts.

Figure b1dp15ec

Length below the head X = 133,3 mm (max.).

5. Refitting

ESSENTIAL: Check that the cylinder head to cylinder block centring pegs are in place.

Fit a new cylinder head gasket.

Follow the direction of fitting: Thickness identification on the fuel high pressure pump side.

Set the camshaft hub.

Position the pistons at mid-stroke.

Remove camshaft gear wheel.

Refit:

  • The cylinder head
  • The cylinder head bolts Lubricate the threads and underside of heads of the bolts

Cylinder head tightening.

Figure b1dp05bc

ESSENTIAL: Follow the tightening sequence.

Pre-tighten to 2 daNm (order from 1 to 10).

Tightening torque to 6 da.Nm (order from 1 to 10).

Tighten by an angle of 220 ° with tool [5] (order from 1 to 10).

Fit the cylinder head cover (4).

6. Camshaft position sensor adjustment

Remove Using tool [3]:

  • The camshaft gear
  • The camshaft hub

ESSENTIAL: Do not press on the target of the camshaft position sensor with the tool [3].

Figure b1bp1zsc

Slacken the bolt (17).

Move the camshaft position sensor (16) to the end of the slots.

Refit the hub and the camshaft drive pinion.

Tighten the bolt (18) to 4,3 daN.m Using tool [3].

ESSENTIAL: Do not press on the target of the camshaft position sensor with the tool [3].

Remove camshaft gear wheel.

Adjust the air gap of the camshaft position sensor (16) = 1,2 mm.

Tighten the bolt (17).

7. Refitting

Proceed in the reverse order to removal.

ESSENTIAL: Replace the removed diesel injection high pressure pipe(s).

Reconnect the battery negative terminal.

ESSENTIAL: Tighten the injector high pressure harness unions using two spanners to prevent any movement (see the relevant operation).

Fill and bleed the cooling system (see the relevant operation).

Fill gearbox with oil and ensure correct level.

Check the seal of the high pressure pipes (see the relevant operation).

Parts & tools for this job For 1998 Citroën Xantia

As an Amazon Associate we earn from qualifying purchases.