Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Lighting and signalling11 Wipers and washers12 Front seats13 Electrical - general14 Starting and charging15 Locking, alarm and airbags16 Heating, air conditioning and audio
Citroën XM II Factory Workshop Manual (1994-2000)01 · Engine
01 · Engine

Removing - refitting: timing belt (DK5ATE)

Make
Citroën
Model
XM II Factory Workshop Manual
Year
1994–2000
Section
Timing gear › Removing - refitting: timing belt (DK5ATE)
EngineRemoving - refitting: timing belt (DK5ATE)

Removing - refitting: timing belt (DK5ATE)

Citroën XM II · Removal-fitting · Ref. B1EG0DP0

Applies to: 2.5 td

1. Recommended tools

Figure b1ep01fc

[1] flywheel locating peg   7014-T.J   (kit 7004-T).

[2] camshaft gear setting rod 5711-T.A   (kit 5711-T).

[3] injection pump setting rod   5711-T.B   (kit 5711-T).

Figure e5-p03fc

[4] tensioning lever   5711-T.E   (kit 5711-T).

Figure e5-p03dc

[5] belt tension measuring instrument with digital read out (SEEM).

4099-T: SEEM C.TRONIC 105.

4122-T: SEEM C.TRONIC 105.5.

2. Preliminary operations

Lift and support the vehicle with front wheels suspended.

Unclip the battery trim cover:

  • 2 Attachment points, front side end
  • 1 Attachment point marked by an arrow towards the air filter   (using a screwdriver)

Disconnect the cable from the battery negative terminal.

Remove:

  • The front right wheel
  • The engine protection plate situated under the RH front wheelarch
  • The front right mud guard
  • The protective panel under the engine
  • The auxiliary equipment drive belt   (see the relevant operation)
Figure b1bp04gc

Withdraw the ECUs from ECU tray (1).

Remove ECU tray (1).

Figure b1bp04hc

Remove:

  • Connector (2) fixing screws
  • The sleeve (3)   (rotate by 1/4 turn)

Unclip the electrical harnesses.

3. Removing

Figure b1bp04ic

Remove:

  • The roller (4)
  • The top timing cover (5)
  • The crankshaft pulley (6)
  • The lower timing cover (7)

Turn the crankshaft in the normal direction of rotation.

Figure b1ep01ic

Peg the flywheel, (behind the engine), by means of tool [1].

Figure b1ep01jc

Peg:

  • Camshaft gear wheel (); Using tool [2]
  • The injection pump gear; Using tool [3]
Figure b1bp04tc

Support the engine using a workshop crane.

Remove:

  • The push rod
  • The bracket (9)
Figure b1bp04uc

Remove the 2 bolts (10).

Figure b1bp04vc

Unscrew the roller tensioner mounting nut (11).

Slightly lower the engine.

Remove the timing belt.

4. Refitting

Check if the rollers operate correctly.

Figure b1bp04wc

Slacken the bolts (13) and (15).

Tighten the screws (13) and (15) by hand   Unscrew them by 1/6 turn.

Turn pinions (12) and (14) fully in the slotted holes   (clockwise).

4.1. Fitting the timing belt

Engage the belt over the following components:

  • The crankshaft gear (17)   (hold the belt in position)
  • The tensioning roller (16)
  • Injection pump pinion (14)
  • Camshaft gear wheel (12)
  • The roller tensioner (18)

N.B.: Rotate the gear to engage it in the nearest belt tooth.

Figure b1bp04xc

Attach the tool [5] to the belt.

Pre-tension the belt by means of tool [4]   (located in the square hole of the roller tensioner).

Tension adjustment:

  • New belt, to 80 daN (107 SEEM units)
  • Used belt, to 50 daN (80 SEEM units)

Tighten roller tensioner (18) nut (11) to 4,5 m.daN.

4.2. Verifying the fitting pre-tension

Remove and refit equipment [5]   (do correct, if necessary).

Tighten screws (13) and (15):

  • Pre-tightening to 1 daNm
  • Tighten to 2,5 daN.m

Remove tools [1, 2, 3, 4] and [5].

Turn the engine 10 revolutions.

Peg the flywheel using the rod [1]:

  • Turn the engine in the normal direction of rotation until the rod [1] can be inserted in the flywheel
  • Never turn back

Slacken the bolts (13) and (15).

Tighten the screws (13) and (15) by hand   Unscrew them by 1/6 turn.

Slacken the belt fully by acting on the roller tensioner.

Peg:

  • Camshaft gear wheel (); Using tool [2]
  • The injection pump pinion by means of tool [3]

Attach the tool [5] to the belt.

Adjust the belt tension by means of tool [4]   (located in the square hole of the roller tensioner).

Tension adjustment:

  • New belt, to 30 daN (58 SEEM units)
  • Used belt, to 25 daN (51 SEEM units)

Tighten roller tensioner (18) nut (11) to 4,5 m.daN.

Remove and refit equipment [5]   (do correct, if necessary).

Tighten screws (13) and (15):

  • Pre-tightening to 1 daNm
  • Tighten to 2,5 daN.m

Remove tools [1, 2, 3, 4] and [5].

Turn the engine 2 revolutions.

4.3. Check

Peg the flywheel with tool [1].

Figure b1ep03dc

Check visually that the setting rods engage freely in the following components:

  • Camshaft gear wheel (12)
  • Injection pump pinion (14)

CAUTION: If they do not, carry out the valve timing as per the "removing-refitting the timing belt" operation instructions.

Remove the tool [1].

5. Additional operations

Lift the engine with the workshop crane.

Relocate the following components   (without tightening):

  • The bracket (9)
  • The push rod
  • The bolts (10)

Withdraw the workshop lift.

Tighten the engine mounting brackets   (see the relevant operation).

Refit:

  • The lower timing cover (7)
  • The crankshaft pulley (6)
  • The top timing cover (5)
  • The roller (4): Tighten to 4,3 daN.m
  • The auxiliary equipment drive belt   (see the relevant operation)
  • The sleeve (3): (rotate by 1/4 turn)
  • The connector (2)
  • ECU tray (1)

Clip the harnesses.

Refit:

  • The protective panel under the engine
  • The front right mud guard
  • The engine protection plate situated under the RH front wheelarch
  • The front right wheel

Tighten the wheel bolts.

Connect the battery negative cable.

Clip in place the battery trim cover.

Return the vehicle to its wheels.

Parts & tools for this job For 1994 Citroën XM

As an Amazon Associate we earn from qualifying purchases.