Overhaul: power assisted steering
- Make
- Citroën
- Model
- Xsara Factory Workshop Manual
- Year
- 1997–2000
- Section
- Power steering › Overhaul: power assisted steering
Overhaul: power assisted steering
1. Tooling
1.1. Recommended tools
[1] ball-joint spanner 80707-T.
1.2. Tools to be produced locally
Extractor tube [2]:
- L = 100 mm
- ØA = 20 mm
- ØB = 21,5 mm
Extractor tube [3]:
- L = 50 mm
- ØA = 22,5 mm
- ØB = 24,5 mm
2. Dismantling
Remove the steering (see the relevant operation).
Measure the distances L1 and L2 corresponding to the extreme positions of the steering rack.
Mid point = (L1 + L2): 2.
Position the rack at the mid-point.
Mark the angular position of the pinion in relation to the distribution valve precisely.
Remove:
- The bolts (1)
- The distribution valve (2)
Remove:
- The bolts (3)
- The bracket (O ring seal)
- The adjusting shims
- The spring
- The thrust pad
- The mountings (4)
- The assistance ram
Remove the rack gaiter flexible bushes.
Remove the rubber ball-joint cover (5), By means of a screwdriver.
Release the lock washers (6), By means of a screwdriver.
Prevent the rack from turning, Using the steering ram fixing.
Remove:
- The ball-joints (7), Using tool [1]
- The plain washers
- The locking washers
Remove the steering rack (8).
3. Replacement of the steering ram mounting bush
3.1. Removing
Place the ram between the thrust tube [3] and the extraction tube [2].
N.B.: The extraction tube must be centred correctly on the hinge outer bush and must not come into contact with the body or the pin of the ram.
Press out the bush.
3.2. Refitting
Offer up the new bush.
Fit the bush, Using tools [2] and [3].
CAUTION: Centre the bush (A = B).
4. Refitting
Fit the rack (8) coated with G6 grease.
Fit a gaiter between the rack and the casing.
Refit:
- The distribution valve (2)
- The bolts (1): Tighten to 1,2 daN.m
Adjust the steering damper (see the relevant operation).
Refit:
- The thrust pad, its spring and its adjusting shims
- The bracket
- The bolts (3): Tighten to 1,2 daN.m
- The locking washers
- The plain washers
- The steering ball-joints (7): Tighten to 6 daN.m
Fit the lock washer (6) in the ball-joint notches.
Refit:
- The ball-joint cover (5)
- The protective gaiters
- The spring clips
- The steering ram fixings (4): Tighten to 5,5 daN.m
Parts & tools for this job For 1997 Citroën Xsara
- TOOLTie rod end toolSearch: tie rod end puller
- TOOLBall joint separatorSearch: ball joint separator
- FLUIDPower steering fluidSearch: Citroën power steering fluid
As an Amazon Associate we earn from qualifying purchases.