Stripping - Re-assembling: engine
- Make
- Citroën
- Model
- Xsara II Factory Workshop Manual
- Year
- 2000–2006
- Section
- Cylinder head › Stripping - Re-assembling: engine
Stripping - Re-assembling: engine
1. Recommended tools
| Reference | Designation | Reference | Reference |
|---|---|---|---|
| [1] | Thrust plate for valve rockers | (-).0132-AE | 4507-T.Z |
| Reference | Designation | Reference | Reference |
|---|---|---|---|
| [2] | flywheel setting rod | (-).0132-QY | 4507-T.A |
| [3] | (/) camshaft setting rod | (-).0132-RZ | 4507-T.B |
| [4] | SEEM belt tension measuring instrument () | S.0192 | |
2. Engine stripping
Remove:
- The timing housings (1)
- The bolts (2)
Peg the camshaft; Using tool [3].
Peg the engine flywheel; Using tool [2].
Slacken the belt fully by acting on the roller tensioner.
Remove:
- The timing belt
- The air injection valve () (according to equipment)
- The cylinder head cover
- The two spacers (/)
- The deflector plate
- The oil filter
- The oil filter bracket (according to equipment)
- The oil pressure switch
- The electric oil gauge
- The dipstick () and its guide ()
- The exhaust heat shield
- The exhaust manifold
- The ignition coils block
- The inlet manifold
- The sparking plugs
- The lifting plates ()
- The thermostat
- The knock sensor
3. Engine re-assembly
3.1. Install the timing belt
N.B.: Check that the camshaft pulley () and the flywheel are pegged; Using tools [2] and [3].
Check that the roller tensioner (3) turns freely (no tight spot).
Position the timing belt, span "a" correctly tightened, in the following order (new belt):
- Crankshaft
- Camshaft
- Coolant pump
- Roller tensioner
3.2. Tensioning the timing belt
Fit the belt tension measuring instrument [4] in place.
Unscrew nut (4).
Turn the roller tensioner (3) anti-clockwise to display 44 SEEM units.
Tighten the nut (4) to 2,2 m.daN.
Remove:
- The camshaft pulley peg [3]
- The flywheel peg [2]
- The belt tension measuring instrument [4]
Turn the crankshaft 4 turn(s) in the direction of running.
Without turning backwards, peg the flywheel; Using tool [2].
Ensure that the timing has been set correctly (it is possible to peg the camshaft pulley).
If pegging proves impossible, start the timing belt fitting operation again.
Unscrew the screws (5).
Position the rocker plate [1] ensuring that it is fitted in the correct direction with regard to the valve gear.
Tighten the bolts (5) (ensure that all of the cams are freed).
CAUTION: Tighten the screws (5) to free the cams but do not place the valves in contact with the piston.
Fit the belt tension measuring instrument [4] in place.
Gradually slacken the roller tensioner (3) to obtain a tension value between 29 and 33 SEEM units.
Tighten the nut (4) to 2,2 m.daN.
Remove:
- The rocker plate [1]
- The flywheel peg [2]
- The belt tension measuring instrument [4]
Turn the crankshaft 2 turn(s) in the direction of running.
Ensure that the flywheel and the camshaft can still be pegged.
If pegging proves impossible, start the timing belt tensioning operation again.
3.3. Engine re-assembly (continued)
Refit the timing covers (1).
Tighten the bolts (2) to 0,8 m.daN.
ESSENTIAL: The new stainless steel seal has stamped sections around the exhaust gas passage holes (at "b"). The curved side of the stainless steel seal must be fitted on the exhaust manifold side.
Refit:
- The exhaust manifold () seal(s) (6)
- The exhaust manifold (7)
CAUTION: There are 2 types of exhaust manifold fixing nut.
(8) Short nut (tighten to 2,3 m.daN).
(9) long nut (tighten to 1,6 m.daN).
CAUTION: Exhaust air injection valve on TU3JP/L4 fiscal incentive.
Refit the exhaust air injection valve (10) and its support (11).
Tighten the fixings securing the valve () on its support to 0,7 m.daN.
Tighten the bolts (12) to 0,8 m.daN.
Tighten the bolts (13) to 0,7 m.daN.
Verify:
- The positioning of the injection rail components
- The condition of the petrol injector O-rings
Fit the injection rail (14) (tighten to 0,7 m.daN).
CAUTION: Fit the new rubber seals to the inlet manifold.
Refit the inlet manifold (15) (tighten to 0,8 m.daN).
Ensure that the fuel rail/manifold connection is in the right position (tighten to 0,8 m.daN).
Refit the coolant temperature sensor (16) (tighten to 2,5 m.daN).
B assembly:
- Fit a new thermostat in the coolant housing (17) (Check that the sealing joint is present)
- Coat the joint faces of the two housings with a thin layer of silicon paste (E10)
Refit the coolant outlet housing (17) (tighten to 0,4 m.daN).
A assembly:
- Fit a coolant outlet end piece with integrated thermostat on the coolant outlet housing (Check that the sealing joint is present) (tighten to 0,8 m.daN)
- Coat the joint faces of the coolant outlet housing with a thin layer of silicon paste (E10)
ESSENTIAL: Fit a new coolant outlet end piece on the coolant outlet housing.
ESSENTIAL: Check that the seal is present.
N.B.: There are various coolant outlet end pieces with integrated thermostat.
(17) coolant outlet housing.
(18) Coolant outlet straight end piece () (According to vehicle).
(19) Coolant outlet curved end piece () (According to vehicle).
ESSENTIAL: The coolant outlet housings (17), fitted with a heater matrix take-off of type "C", must be fitted with a coolant outlet end piece fitted with a lug of type "D".
The coolant outlet housings (17), fitted with a heater matrix take-off of type "E", must be fitted with a coolant outlet end piece fitted with a lug of type "F".
Refit:
- The lifting plates (20) (tighten to 3 m.daN)
- The sparking plugs (tighten to 2,8 m.daN)
- The compact coil unit (21) (depending on engine)
Tighten the bolts to 0,8 m.daN.
Refit the cowling and the coil (22) (depending on engine).
Tighten the bolts to 0,5 m.daN.
Refit the knock sensor (23) (tighten to 2 m.daN).
Refit:
- The heat shield (24) (tighten to 0,8 m.daN)
- The dipstick guide tube (25) (sealing on block with RECTIJOINT adhesive paste)
- The dipstick (26)
- The electric gauge (27) (according to equipment) (tighten to 2,7 m.daN)
Refit:
- The heat exchanger (28) (according to equipment)
- The nipple (29) (according to equipment) (tighten to 0,8 m.daN)
Refit:
- The oil filter bracket (according to equipment) (tighten to 1 m.daN)
- A new oil filter (30)
- The oil pressure switch (31) (tighten to 2 m.daN)
Refit:
- The deflector plate (32)
- The two spacers (33)
- The cylinder head cover (34) with a new seal
Cylinder head cover with fixing hole diameter 8 mm: Fit the new seal washers beneath the nuts (tighten to 1,6 m.daN).
Cylinder head cover with fixing hole diameter 6 mm:
- The new studs are stepped, diameter 6 x 8
- The blind nuts are fitted with integrated seals (tighten to 0,7 m.daN)
Parts & tools for this job For 2000 Citroën Xsara
- PARTEngine gasket setSearch: Citroën Xsara 2000 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.