dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Safety Precautions|Page 7084 > < Safety Precautions|Page 7082
Page 8
background image

Illustration E

4. Pre-fit the backer panels to the roof and the insert patch to ensure a proper fit. If screws Will be required to hold the backer panels and the inseit in

place during application they Should be used during the dry fit.

5. Using Mopar (part # 05083855AA) / Fusor #112B dispense a small amount of adhesive with out the tip to assure there is an even flow of adhesive

from booth sides of the cartndge. Once you are sure there is even flow install the mixing tip and pump the adhesive through the mixing tip.

Note: Apply the structural adhesive to all bare metal at the bond area The adhesive has corrosion resistant properties built-in to protect the metal from

corrosion.

6. Apply 3/8 to 1/2 inch of Mopar / Fusor #112B to the mounting area of the insert panels. From this point you will have approximately 70 minutes @

21 °C (70 °F) to apply the adhesive and assemble the components.

Safety Precautions|Page 7084 > < Safety Precautions|Page 7082