Contour V6-153 2.5L DOHC (1996)
Fig. 22 Front cover bolt & stud bolt installation sequence
4. Install front cover bolts and stud bolts in proper locations and sequence. Tighten cover bolts 1/4 turn after cover contacts cylinder block and
cylinder heads. Install bolts and stud bolts no more than six minutes after applying sealer.
