ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Campaign - Police Interceptor Optional Upgrade|Page 4061 > < Campaign - Police Interceptor Optional Upgrade|Page 4059
Page 12
background image

13.

Using Motorcraft Brake Parts Cleaner or equivalent and a clean shop rag, clean the top surface of the canister. Affix the two (2) self-adhesive
foam pads onto the canister in the position shown in the illustration. See Figure 9.

14.

Reconnect the canister purge valve, then position the evaporative emissions canister and install the two (2) retaining nuts finger tight.

15.

CAUTION: The rivets supplied in the kit provide a high clamp-load and MUST be used. Using rivets other than what is supplied in the kit may
jeopardize the repair.

NOTE:

The kit comes with a total of five (5) rivets. Only three (3) are required for this repair. These rivets are very sturdy and may be difficult to
install with a small, hand-held pop rivet installer. The use of a large capacity or air/hydraulic rivet installer is recommended but is not
necessary.

Install the three (3) rivets, then tighten the two canister retaining nuts to 6 Nm (53 lb-in).

16.

Lower the vehicle.

Campaign - Police Interceptor Optional Upgrade|Page 4061 > < Campaign - Police Interceptor Optional Upgrade|Page 4059