E 150 V8-4.6L (2007)
26. Connect the upper radiator hose.
27. Connect the fuel supply tube spring lock coupling. For additional information, refer to Fuel Delivery and Air Induction.
28. Install the 8 ignition coils. For additional information, refer to Ignition System.
^
Position the PCV tube and connect the quick connect couplings. For additional information, refer to Fuel Delivery and Air Induction.
29. Install the throttle body (TB). For additional information, refer to Fuel Delivery and Air Induction.
30. Install the engine cover.
31. Connect the battery ground cable. For additional information, refer to Battery.
32. Fill and bleed the engine cooling system. For additional information, refer to Cooling System.