E 450 V10-6.8L (2008)
^
Inspect and clean the sealing surfaces with metal surface prep. Follow the directions on the packaging.
^
Install a new O-ring seal.
^
To install, tighten to 25 Nm (18 lb-ft).
5. To install, reverse the removal procedure.
6. Fill and bleed the engine cooling system.