E 450 V10-6.8L (2008)
8. Position the fuel charging wiring harness onto the valve cover studs.
9. Connect the pushpin retainers to the PCM bracket.
10. Position the LH fuel charging wiring harness and install the 2 bolts.
^
Tighten to 10 Nm (89 lb-in).
11. Connect the LH 5 fuel injector electrical connectors.