E 450 V8-5.4L (2009)
Installation
All vehicles
1. Using petroleum jelly to hold the bearing or bushing in place, install the output shaft bearing for slip flange models and the bushing for fixed
flange models.
2. NOTICE: Be careful not to damage the seals when installing the output shaft.
If the output shaft was removed, install the output shaft and park gear assembly.
3. Install the park pawl shaft.
1. Install the park pawl shaft.
2. Install the park pawl.
3. Install the park pawl return spring.
4. Install the parking rod guide plate.
1. Install the parking rod guide plate.
2. Install the bolts.
-
Tighten to 25 Nm (18 lb-ft).