Econoline E250 3/4 Ton V8-4.6L SOHC VIN W (2000)
15. Lower the vehicle and, with the vehicle weight on the suspension, tighten the axle pivot bolt and nut to specification.
16. Perform front end alignment.
15. Lower the vehicle and, with the vehicle weight on the suspension, tighten the axle pivot bolt and nut to specification.
16. Perform front end alignment.