Econoline E350 1 Ton V8-5.4L Prop SOHC VIN Z (1998)
2. Install the A/C cycling switch.
-
Lubricate the new O-rings with Motorcraft YN-12c refrigerant oil or equivalent meeting Ford specification WSH-M1C231-B.
3. Install the suction accumulator/drier.
1. Install the suction accumulator/drier.
2. Install the screws.
4. Connect the A/C cycling switch connector.
5. Connect the evaporator discharge line.
1. Lubricate the new O-rings with Motorcraft YN-12c refrigerant oil or equivalent meeting Ford specification WSH-M1C231-B and install the
O-rings.
2. Connect the evaporator discharge line.