Econoline E350 1 Ton V8-5.4L Prop SOHC VIN Z (1998)
7. Remove the (A) direct clutch pressure plate and the (B) clutch pack.
NOTE: Tag the parts for identification during installation.
8. Using the (A) Clutch Spring Compressor, compress the (B) direct clutch return spring assembly and remove the (C) direct clutch return spring
retaining ring. Remove the tool.
CAUTION: Do not fully compress the return springs or the spring may break.
9. Remove the direct clutch return spring assembly.
10. Remove the direct clutch piston.