Fusion FWD L4-2.5L Hybrid (2010)
Yes
CONNECT the negative battery cable. GO to AE42.
No
REPAIR the circuit in question. CONNECT the negative battery cable. CLEAR the DTCs. REPEAT the network test with the scan tool.
-------------------------------------------------
AE10 CHECK THE HS-CAN CIRCUITS BETWEEN THE IPC (GASOLINE ENGINE) AND THE DLC FOR AN OPEN
-
Disconnect: Instrument Panel Cluster (IPC) C220 .
-
Measure the resistance between the IPC C220-25, circuit VDB04 (WH/BU), harness side and the DLC C251-3, circuit VDB06 (GY/OG), harness
side.
-
Measure the resistance between the IPC C220-26, circuit VDB05 (WH), harness side and the DLC C251-11, circuit VDB07 (VT/OG), harness
side.
-
Are the resistances less than 5 ohms?
Yes
CONNECT the negative battery cable. GO to AE50
No
REPAIR the circuit in question. CONNECT the negative battery cable. CLEAR the DTCs. REPEAT the network test with the scan tool.
-------------------------------------------------
AE11 CHECK THE HS-CAN CIRCUITS BETWEEN THE BECM (HYBRID) AND THE DLC FOR AN OPEN
-
Disconnect: Battery Energy Control Module (BECM) C4237a .
-
Measure the resistance between the BECM C4237a-22, circuit VDB04 (WH/BU), harness side and the DLC C251-3, circuit VDB06 (GY/OG),
harness side.