Ford Workshop Service and Repair Manuals
HOME
FEATURES
MENU
INDEX
ABOUT US
General Procedures|Removal and Installation >
< Roof Opening Panel Alignment
Galaxy 2000.75 (04.2000-02.2006)
Mechanical Repairs
5 Body and Paint / 501 Body and Paint
501-17 Roof Opening Panel
Diagnosis and Testing
General Procedures
Motor Synchronization
Roof Opening Panel - Motor Synchronization
Galaxy 2000.75 (04/2000-02/2006)
General Procedures
NOTE:
The roof opening panel motor must be synchronized with the roof opening panel before installation.
NOTE:
The roof opening panel must be in the closed position for synchronization.
Connect the roof opening panel motor electrical connector.
Connect the roof opening panel control switch electrical connector.
Hold the roof opening panel control switch in the close position, until the roof opening panel motor automatically stops.
Disconnect the roof opening panel control switch electrical connector.
Disconnect the roof opening panel motor electrical connector.
Mechanical Repairs
5 Body and Paint / 501 Body and Paint
501-17 Roof Opening Panel
Diagnosis and Testing
General Procedures
Motor Synchronization
General Procedures|Removal and Installation >
< Roof Opening Panel Alignment