Savana 3500 V8-4.8L (2009)
11. Install the PCV hose - dirty air (716).
12. Connect the knock sensor harness electrical connector to the intake manifold.
13. Connect the following electrical connectors:
*
MAP sensor (1)
*
Knock sensor (2)
*
Exhaust gas recirculation (EGR) valve, if equipped
14. Install the fuel injectors. Refer to Fuel Injector Replacement (See: Powertrain Management/Fuel Delivery and Air Induction/Fuel Injector/Service
and Repair/Removal and Replacement).
15. Install the throttle body. Refer to Throttle Body Assembly Replacement (See: Powertrain Management/Fuel Delivery and Air Induction/Throttle
Body/Service and Repair/Removal and Replacement).