Savana 3500 V8-6.0L (2007)
![background image](/gmc/savana_3500/v8-6.0l/Page-634002.png)
1. Install the PCM to the PCM mounting tray.
2. Secure the spring latch to the PCM.
Notice: Refer to Fastener Notice.
3. Connect the PCM connectors to the PCM.
Tighten the PCM connector end fasteners to 8 N.m (71 lb in).
4. Connect the negative battery cable.
5. If a new PCM is being installed, program the PCM. Refer to Control Module References. See: Testing and Inspection/Programming and
Relearning