gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Expansion Block/Orifice Tube > < Evaporator Core|Front|Page 5672
Page 3
background image

^  Bulb must make good contact with the line.
^  Add 30 ml (3 ounces) of clean refrigeration oil to new core.

5.  Upper case and supports to the core.
6.  Lower core case and blower assembly.
7.  Blower-evaporator assembly to the roof.
8.  Support to roof rail screws.
9.  Refrigerant lines to the blower-evaporator unit.

^  Use new seals (0-rings) with clean refrigeration oil.

10.  Blower lead wire.
11.  Ground wire.
12.  Rear duct.
13.  Battery ground cable.
14.  Evacuate, charge and check the system.

Expansion Block/Orifice Tube > < Evaporator Core|Front|Page 5672