honda Workshop Repair Guides

Honda Workshop Service and Repair Manuals

ABS / PC Resin Parts|Page 8155 > < ABS / PC Resin Parts|Page 8153
Page 7
background image

15. Drying top coat

WARNING:  Body parts being dried with an industrial dryer can get hot enough to cause injury. Do not touch parts being dried.

-

Before force drying, let it air dry for 5-10 minutes.

-

Force dry the sprayed surface under the infrared lamps for 60-90 minutes.

-

Keep the drying temperature between 140 degrees F (60 degrees C) and 158 degrees F (70 degrees C).

NOTE: Take care not to let the heat deform the part during the drying process.

16. Polishing and Buffing

-

Let the paint dry gradually, then polish the surface carefully using a polishing compound and sponge buff.

-

To remove lint or dirt, wet sand the surface with #2000 or finer paper first, then polish with compound.

NOTE: Polish all roughness caused by sanding thoroughly. To do this, first polish with very fine compound, then with ultra fine compound.

-

After polishing, remove the masking paper and tape and wash the entire vehicle thoroughly.

ABS / PC Resin Parts|Page 8155 > < ABS / PC Resin Parts|Page 8153