H2 V8-6.2L (2008)
13. Connect the following electrical connectors to the right side of the engine:
*
Main coil (4)
*
Fuel injectors (3)
14. Install the CPA retainer (5).
15. Install the harness clips to the fuel rail (1).
16. Connect the ETC electrical connector (2). Perform the following:
1. Connect the connector.
2. Engage the gray retainer.
17. Connect the following electrical connectors:
*
MAP sensor (1)
*
Knock sensor (2)
18. Install the knock sensor harness connector to the intake manifold.