Tiburon L4-2.0L (1999)
5. Install the timing belt on the camshaft.
When the timing belt is installed on the camshaft sprocket, make sure that the tension side pulley is pushing the belt toward the water pump.
6. Turn the crankshaft one turn in operating direction (clockwise) and realign crankshaft sprocket timing mark.
CAUTION: Do not turn the crankshaft in a counterclockwise direction. The crankshaft should be turned smoothly.
Tightening torque:
Tensioner pulley installing bolt: 43 - 55 Nm (430 - 550 kg.cm, 32 - 41 ft. lbs.)
7. Then recheck the belt tension. The tension side of timing belt is pushed in horizontally with a moderate force [approximately 2 kg (20 N, 5 lbs.)],
the timing belt cog end is approximately 4 - 6 mm (0.16 - 0.24 inch) away.
8. Install the timing belt cover.
Tightening torque:
Timing belt cover bolt: 8 - 10 Nm (80 - 100 kg.cm, 6 - 7.4 ft. lbs.)