isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Common Chamber Replacement|Page 1298 > < Common Chamber Replacement|Page 1296
Page 3
background image

4. Install water pipe to intake manifold.
5. Install generator bracket and tighten generator bracket bolts.

Torque:

Long bolts: 35 N-m (25 lb ft)
Short bolts: 20 N-m (14 lb ft)
 

6. Install fuel rail assembly to intake manifold and connect hose between fuel pressure regulator and throttle body.
7. Install fuel pipe and tighten joint eye bolt and connect fuel injector harness.

Torque:  25 N-m (18 lb ft) 

8. Connect the connector for throttle position sensor and idle air control valve sensor to throttle body
9. Install water hoses to throttle body.

10. Install intake duct assembly to throttle body and air cleaner then tighten nut to the intake duct bracket and clamp on the throttle body side and air

cleaner side.

Torque:  7 N-m (5.1 lb ft) 

Common Chamber Replacement|Page 1298 > < Common Chamber Replacement|Page 1296