isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

EGR Duty Solenoid|Page 1453 > < EGR Cut Solenoid|Page 1450
Page 1
background image

EGR Vacuum Switching Valve: Testing and Inspection
EGR Duty Solenoid

EGR Solenoid

-

Disconnect electrical connector and apply battery voltage to VSV electrical terminals.  Air should flow freely between "Y" and "Z" ports. Air
should not flow between "X" and "Y" ports.

-

Disconnect battery voltage.  Air should flow freely between "X" and Y" ports. Air should not flow between "Y" and "Z" ports.

-

Replace VSV if it fails this test.

EGR Duty Solenoid|Page 1453 > < EGR Cut Solenoid|Page 1450