isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Intake Manifold|Upper|Page 1740 > < Intake Manifold|Upper|Page 1738
Page 4
background image

5. Install the accelerator and cruise control cable bracket to the throttlebodyy.
6. Install the accelerator and cruise control cable bracket nuts.

Tighten the accelerator and cruise control cable bracket nuts to 9 N.m (80 lb in).

7. Install the accelerator control cable bracket to the throttle body and the intake manifold.

Tighten the accelerator control cable bracket studs and nuts to 12 N.m (106 lb in).

8. Install the cruise control cable, if equipped to the throttle shaft and the bracket.
9. Install the accelerator control cable to the throttle shaft and the bracket.

10. Install the EVAP canister purge solenoid valve. 

11. Connect the PCV valve hose assembly to the intake manifold and the valve rocker arm cover.

Intake Manifold|Upper|Page 1740 > < Intake Manifold|Upper|Page 1738