isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Hose/Line HVAC|Service and Repair > < Technician Safety Information|Page 5469
Page 4
background image

Refrigerant Line Installation

-

Use the proper wrenches when making connections on O-ring seal fittings. Using improper wrenches may damage the connection. The opposing
fitting should always be backed up with a wrench to prevent distortion of connecting lines or components. When connecting the flexible hose
connections, it is important that the swaged fitting and the flare nut, as well as the coupling to which it is attached, be held at the same time using
three different wrenches to prevent turning the fitting and damaging the seat.

Tighten tubing connections to the specified torque. Refer to Fastener Tightening Specifications.

Hose/Line HVAC|Service and Repair > < Technician Safety Information|Page 5469