isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Air Injection Control Valve|Service and Repair|Page 3095 > < Air Injection Control Valve|Service and Repair|Page 3093
Page 4
background image

1. Connect the reactor pipe assembly to the reactor pipes by installing the spring clamps.

2. Install the vacuum hose (1) to the shut-off valve(2).

3. Connect the shut-off valve hose (1) to the AIR pump by installing the spring clamp.
4. For a 2WD vehicle, skip steps 7 and 8. For a 4WD vehicle, skip steps 5 and 6.

Air Injection Control Valve|Service and Repair|Page 3095 > < Air Injection Control Valve|Service and Repair|Page 3093