isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Steering Gear Replacement|Page 5107 > < Steering Gear Replacement|Page 5105
Page 9
background image

Tools Required

-

J 4245 Snap Ring Pliers

-

J 6219 Pitman Shaft Oil Seal Installer

1. Lubricate the new seals with grease.
2. Apply a single layer of tape to the pitman arm shaft in order to avoid damaging the seals.
3. Install the pitman shaft oil seal (2) and washer (3) to Power Steering gear.

4. Use J 6219 in order to seat the pitman shaft oil seal (2) and the washer (3) into the power steering gear.

The seal should be in far enough to install the return (4), dust seal(5), and snap ring (6).

5. Install the return ring (4), dust seal (5), to the power steering gear.
6. Use J 6219 in order to seat the return ring (4) and dust seal(5) into the power steering gear.
7. Install the snap ring (6) to the pitman arm shaft using J 4245.
8. Install the power steering gear. Refer to Pitman Arm Replacement (4WD). See: Pitman Arm

Pitman Shaft Seals and Bearing Replacement

Pitman Shaft Seals and Bearing Replacement

Disassembly Procedure

Tools Required

-

J 6278 Pitman Shaft Bearing Remover and Installer

-

J 6219 Pitman Shaft Oil Seal Installer J 4245 Internal Snap Ring Pliers

Steering Gear Replacement|Page 5107 > < Steering Gear Replacement|Page 5105