i-290 2WD L4-2.9L (2008)
3. Install the radiator vent hose to the coolant recovery reservoir.
4. Install the bolt (4) securing the coolant recovery reservoir (5) to the coolant recovery reservoir bracket.
Tighten the nut to 10 N.m (88 lb in).
5. Install the overflow hose (6) to the coolant recovery reservoir (5).
6. Install the air cleaner assembly. Refer to Air Cleaner Assembly Replacement (See: Engine/Tune-up and Engine Performance Checks/Air Cleaner
Housing/Service and Repair) or Air Cleaner Assembly Replacement (See: Engine/Tune-up and Engine Performance Checks/Air Cleaner
Housing/Service and Repair).
7. Fill the cooling system. Refer to Cooling System Draining and Filling (Static Fill) (See: Service and Repair/Cooling System Draining and Filling
(Static Fill))Cooling System Draining and Filling (Vac N Fill) (See: Service and Repair/Cooling System Draining and Filling (Vac N Fill)).