isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Valve Body, A/T|Diagrams|Page 14551 > < Valve Body, A/T|Diagrams|Page 14549
Page 1
background image

Valve Body: Service and Repair

Valve Body and Pressure Switch Replacement

Removal Procedure

1. Ensure that removal of the valve body is necessary before proceeding.

The following components can be serviced without removing the valve body from the transmission:

*

The torque converter clutch solenoid (1)

*

The pressure control solenoid (2)

*

The internal wiring harness (3)

*

The 2-3 shift solenoid (4)

*

The 1-2 shift solenoid (5)

*

The transmission fluid pressure manual valve position switch (6)

*

The 3-2 shift solenoid (7)

*

The torque converter clutch pulse width modulation (TCC PWM) solenoid (8)

2. Remove the fluid level indicator.
3. Remove the transmission filter. Refer to Automatic Transmission Fluid and Filter Replacement  (See: Service and Repair/Removal and

Replacement/Automatic Transmission Fluid and Filter Replacement) .

4. Disconnect the internal wiring harness electrical connectors from the following components:

*

The transmission fluid pressure manual valve position switch (1)

*

The 1-2 shift solenoid (2)

*

The 2-3 shift solenoid (3)

*

The pressure control solenoid (4)

*

The TCC PWM solenoid (5)

*

The 3-2 shift solenoid (6)

Valve Body, A/T|Diagrams|Page 14551 > < Valve Body, A/T|Diagrams|Page 14549