isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Valve Body, A/T|Diagrams|Page 14557 > < Valve Body, A/T|Diagrams|Page 14555
Page 7
background image

3. Install the 1-2 accumulator cover and pin assembly (57).
4. Install the 1-2 accumulator cover bolts (58, 59).

Tighten the bolts to 10 N.m (89 lb in).

Ball Check Valves

5. Install the 7 checkballs into the valve body. 

6. Install the valve body to the transmission case while simultaneously connecting the manual valve link to the manual valve.

Valve Body, A/T|Diagrams|Page 14557 > < Valve Body, A/T|Diagrams|Page 14555