isuzu Workshop Repair Guides

Isuzu i-350 L5-35L Workshop Service and Auto Repair Manuals

Global Positioning System Module > < Coaxial Cable Replacement - Navigation and Cellular Telephone Antenna (With RPO Code UE1)|Page 7557
Page 2
background image

1. Install the bracket to the I/P structure.

2. Install the nuts (1) retaining the bracket to I/P structure.

Tighten the fasteners to 9 N.m (80 lb in).

NOTE:  Refer to Fastener Notice in Service Precautions.

3. Install the VCIM.

Global Positioning System Module > < Coaxial Cable Replacement - Navigation and Cellular Telephone Antenna (With RPO Code UE1)|Page 7557