i-350 L5-3.5L (2006)
8. Remove the 3-2 control solenoid retainer with a small screwdriver. Rotate the solenoid in the bore, if necessary, until the flat part of the retainer is
visible.
9. Remove the 3-2 control solenoid.
Installation Procedure
1. Install the 3-2 control solenoid.
2. Install the 3-2 control solenoid retainer.
3. Install the 1-2 and 2-3 shift solenoids.
4. Install the 1-2 and 2-3 shift solenoid retainers.