isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Charging System > < Battery Box Replacement|Page 15864
Page 4
background image

5. Plug the weld accordingly.

6. Clean and prepare all welded surfaces.
7. Apply the sealers and anti-corrosion materials to the repair area, as necessary. Refer to Anti-Corrosion Treatment and Repair  () .
8. Paint the repair area. Refer to Basecoat/Clearcoat Paint Systems  (See: Body and Frame/Paint, Striping and Decals/Paint/Application and

ID/Basecoat/Clearcoat Paint Systems) .

9. Install all related panels and components.

10. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection  (See: Battery Cable/Negative/Service and

Repair/Procedures) .

11. Enable the SIR system. Refer to SIR Disabling and Enabling  (See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument Panel/Air

Bag(s) Arming and Disarming/Service and Repair) .

Charging System > < Battery Box Replacement|Page 15864