isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Control Arm|Front|Page 1493 > < Control Arm|Front|Page 1491
Page 3
background image

Fig. 9  Compressor tool components

i.

Loosen rod 3, Fig. 6 on each side alternately and evenly, then separate coil spring from lower link.

3.

During installation, torque upper link bolt to 44-50 ft. lbs. Torque lower link bolt to 58-65 ft. lbs. Torque upper link to steering knuckle nuts to
54-65 ft. lbs.

Control Arm|Front|Page 1493 > < Control Arm|Front|Page 1491