isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Control Arm > < Ball Joint|Specifications|Page 3277
Page 3
background image

INSTALLATION
Upper Nuts final Torque N.m (ft.lb) 69 (51)

Lower Nuts final Torque N.m (ft.lb) 103 (76)

Nut and Cotter Pin Torque Upper N.m (lb.ft) 98 (72)

Nut and Cotter Pin Torque Lower N.m (lb.ft) 127 (94)
1992-93 Trooper

PRELOAD TORQUE INSPECTION AND REPAIR:
Upper Link End   N.m (lb.ft.) 1.3 - 3.2 (0.4 - 2.4)

Lower Link End   N.m  (lb.ft.) 0.5 - 6.4 (.4 - 4.7)

INSTALLATION
Upper Nuts final Torque N.m (ft.lb) 57 (42)

Lower Nuts final Torque N.m (ft.lb) 103 (76)

Nut and Cotter Pin Torque Upper N.m (lb.ft) 98 (72)

Nut and Cotter Pin Torque Lower N.m (lb.ft) 148 (108)
1994-96 Trooper
 Preload torque N.m (lb.ft.) 0.5 - 3.2 (0.4 - 2.4) 
If the above limits specified are exceeded, replace the end assembly.

Control Arm > < Ball Joint|Specifications|Page 3277