isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Blower Link Unit and / or Mode Door|Page 3865 > < Blower Link Unit and / or Mode Door|Page 3863
Page 2
background image

REMOVAL

Preparation:

Battery ground cable
Drain engine coolant
Discharge and recover refrigerant (W/Air conditioning).

1. Heater unit
2. Case (Temperature control)

-

Remove the case (Temperature control) from the heater unit.

3. Rod
4. Sub-lever
5. Door lever

-

Pull out the door lever while raising up the catch of the door lever.

6. Clip

INSTALLATION

To install, follow the removal steps in the reverse order, noting the following point:

1. Apply grease to sub-lever and to the abrasive surface of the heater unit.

Blower Link Unit and / or Mode Door|Page 3865 > < Blower Link Unit and / or Mode Door|Page 3863