isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Connecting Rod, Engine|Removal and Installation|Page 1496 > < Connecting Rod, Engine|Removal and Installation|Page 1494
Page 3
background image

2. Install oil gallery and tighten the bolts in two steps, in the order shown in illustration. 

Torque: 
1st step: 29 Nm (21 ft. lbs.) 
2nd step: 55° - 65° 

3. Install oil pipe with O-ring.

Torque: 10 Nm (89 inch lbs.) 

4. Install oil strainer assembly with O-ring.

Torque: 25 Nm (18 ft. lbs.) 

5. Install crankcase with oil pan.

Refer to installation procedure for Oil Pan and Crankcase.

6. Install cylinder head assembly.

Refer to installation procedure for Cylinder Head.

Connecting Rod, Engine|Removal and Installation|Page 1496 > < Connecting Rod, Engine|Removal and Installation|Page 1494