isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Evaporator Core > < HVAC System - Unpleasant Odors When In Use|Page 6661
Page 2
background image

To install, follow the removal steps in the reverse order, noting the following points:

1. To install a new evaporator assembly, add 50 cc (1.7 fl.oz.) of new compressor oil to the new core.
2. Tighten the refrigerant outlet line to the specified torque.

Torque: 25 N.m (18 lb.ft)

3. Tighten the refrigerant inlet line to the specified torque.

Torque: 15 N.m (11 lb.ft)

4. O-rings cannot be reused. Always replace with new ones.
5. Be sure to apply new compressor oil to the O-rings when connecting lines. 

Evaporator Core > < HVAC System - Unpleasant Odors When In Use|Page 6661