Rodeo LS 4WD V6-3.2L (1998)
Figure 10: Add 1 shim at the top of the No.3 mount.
11.
Add 1 shim to top of No.3 body mount bushing (1,between the body and mount), reinstall the body mount bolt through access hole, and
hand-thread the bottom nut. (Figure 10)
12.
Lower the floor-jack to allow body to rest on the body mounts.
Figure 11: Torque the bolt and nut to 50 N.m (37 lb. ft.)
13.
Tighten and torque the No.2 body mount bolt and nut to specification: 50 N.m (37 lb. ft.) (Figure 11)