isuzu Workshop Repair Guides

Isuzu Rodeo 4WD V6 Auto Repair Manuals - Workshop Service Available

Turbine Shaft, A/T > < Transmission Temperature Sensor/Switch, A/T|Description and Operation
Page 1
background image

Transmission Temperature Sensor/Switch: Service and Repair

REMOVAL   

Preparation: 
- Disconnect negative (-) battery cable. 
- Drain fluid.

1. Adapter case oil pan. Remove twelve 10 mm screws, adapter case oil pan and gasket.

NOTE:  Oil pan still contains transmission fluid. Place a large drain container under the oil pan. Drain the fluid carefully.

2. Wiring harness:

a. Disconnect wiring harness from force motor solenoid, converter clutch solenoid and 5 pin connector of adapter case. Pull only on connectors,

not on wiring harness.

b. Remove wiring harness assembly (transmission oil temperature sensor).

INSTALLATION   

NOTE:  To install, follow the removal steps in the reverse order, noting the following points;

1. Wiring harness. Install harness assembly to converter clutch solenoid, force motor and 5 pin connector of adapter case.
2. Adapter case oil pan:

a. Install oil pan gasket, oil pan and twelve 10 mm screws. 

^

Torque 11 Nm (96 inch lbs.).

b. Fill transmission through the overfill screw hole of oil pan, using ATF DEXRON-III. 
c. Connect negative (-) battery cable.

Turbine Shaft, A/T > < Transmission Temperature Sensor/Switch, A/T|Description and Operation