isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Piston, Engine|Specifications|Page 1211 > < Piston, Engine|Specifications|Page 1209
Page 2
background image

8. Remove the piston rings (8) with a piston ring expander. Arrange the removed piston rings in the cylinder number order.
9. Remove the piston pin (9).

-

Heat the connecting rod and the piston pin with oil heater, when it temperature is keep at 280°C - 320°C.

-

Push the piston pin with brass bar.

NOTE:  Keep the parts removed from each cylinder separate. All parts must be reinstalled in their original positions.

10. Piston (10).
11. Connecting rod (11).

INSPECTION AND REPAIR 

Pistons (10) 
Carefully clean away all the carbon adhering to the piston head and the piston ring grooves.

NOTE:  Never use a wire brush to clean the pistons. Damage will result. Visually check each piston for cracking, scoring, and other signs of excessive
wear. If any of the above conditions are found, the piston must be replaced.

Piston Rings (8) 
Any worn or damaged part discovered during engine overhaul must be replaced with a new one. 
1. Ring end gap measurement

-

Insert the piston ring into the bore.

-

Push the ring by the piston, at a right angle to the wall, into the point at which the cylinder bore diameter is the smallest.

-

Measure the ring end gap.

Compression Ring
1st ring
Standard: 0.30 mm - 0.50 mm (0.0118 inch - 0.0195 inch)
2nd ring
Standard: 0.30 mm - 0.50 mm (0.0118 inch - 0.0195 inch)
Oil ring
Standard: 0.40 mm - 1.40 mm (0.0156 inch - 0.0546 inch)
 

2. Measure the clearance between the piston ring groove and the piston ring with a feeler gauge. If the piston ring groove/piston ring clearance

exceeds the specified limit, the piston must be replaced.

Compression Ring Clearance
Standard: 0.02 mm - 0.04 mm (0.0008 inch - 0.0016 inch)
 

Piston Pin (9) 

NOTE:  Do not reuse the old piston pin.

Piston, Engine|Specifications|Page 1211 > < Piston, Engine|Specifications|Page 1209