Rodeo S 2WD L4-2.2L (1999)
5. Install generator bracket and tighten generator bracket bolts.
Torque
Long bolts: 35 Nm (25 ft. lbs.)
Short bolts: 20 Nm (14 ft. lbs.)
6. Install fuel rail assembly to intake manifold and connect hose between fuel pressure regulator and throttle body.
7. Install fuel pipe and tighten joint eye bolt and connect fuel injector harness.
Torque: 25 Nm (18 ft. lbs.)
8. Connect the connector for throttle position sensor and idle air control valve sensor to throttle body.
9. Install water hoses to throttle body.
10. Install intake duct assembly to throttle body and air cleaner then tighten nut to the intake duct bracket and clamp on the throttle body side and air
cleaner side.
Torque: 7 Nm (5.1 ft. lbs.)
11. Install PCV hose to air intake duct.
12. Install throttle valve control cable to throttle body.
13. Confirm the free play of throttle valve control cable.
Free play: 5.7 to 6.3 mm