isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

System Relay, HVAC > < Refrigerant Pressure Sensor / Switch, HVAC|Locations|Page 4808
Page 1
background image

Refrigerant Pressure Sensor / Switch: Service and Repair

Pressure Switch and Associated Parts

Removal

1. Disconnect the battery ground cable. 
2. Discharge and recover refrigerant. 
3. Remove radiator grille. 
4. Disconnect pressure switch connector. 
5. Disconnect pressure switch. 

-

When removing the switch connected part, the connecting part should immediately be plugged or capped to prevent foreign matter from being
mixed into the line. 

Installation

To install, follow the removal steps in the reverse order, noting the following point:

1. O-ring cannot be reused. Always replace with a new one. 
2. Be sure to apply new compressor oil to the O-ring when connecting pressure switch. 
3. Tighten the pressure switch to the specified torque. 

Torque: 13 Nm (113 lb.in)

System Relay, HVAC > < Refrigerant Pressure Sensor / Switch, HVAC|Locations|Page 4808