isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Sensors and Switches - Emission Control Systems > < Positive Crankcase Ventilation Valve|Testing and Inspection
Page 1
background image

Positive Crankcase Ventilation Valve: Service and Repair

Positive Crankcase Ventilation (PCV) Valve

REMOVAL

1. Remove the vacuum hose at the PCV valve. 
-

Slide the clamp back to release the hose.

2. Pull the PCV valve from the rubber grommet in the right valve cover.

INSTALLATION

1. Push the PCV valve into the rubber grommet in the left valve cover.

2. Install the vacuum hose on the PCV valve and secure the vacuum hose with the clamp.

Sensors and Switches - Emission Control Systems > < Positive Crankcase Ventilation Valve|Testing and Inspection