isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Ball Joint|Lower|Page 4230 > < Ball Joint|Lower
Page 2
background image

-

Inspect the lower end boot for damage or grease leak. Move the ball joint as shown in the figure to confirm its normal movement .

-

Inspect screw/taper area of ball for damage.

-

If any defects are found by the above inspections, replace the ball joint assembly with new one.

-

After moving the ball joint 4 or 5 times, attach nut the measure the preload. Starting torque: 0.5-6.4 Nm (0.4-4.7 ft. lbs.).

-

If the above limits specified are exceeded, replace the ball joint assembly.

INSTALLATION 

1. Install lower ball joint.
2. Install bolt.
3. Install nut and tighten it to the specified torque. Torque to 116 Nm (85 ft. lbs.).
4. Install ball joint nut, then tighten it to the specified torque with just enough additional torque to align cotter pin holes. Install new cotter pin.

Torque to 147 Nm (108 ft. lbs.).

Ball Joint|Lower|Page 4230 > < Ball Joint|Lower