isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Left Hand Side|Page 1178 > < Left Hand Side
Page 2
background image

INSTALLATION

1. Cylinder head cover [8]

^

Clean the sealing surface of cylinder head and cylinder head cover to remove oil and sealing materials completely. Apply sealant (TB1207B or
equivalent) of bead diameter 2-3 mm at four places of arched area of camshaft brackets on front and rear sides.

^

Tighten bolts to 8 Nm (69 inch lbs.).

2. Throttle body and cable [7]

^

Tighten bolts to 19 Nm (14 ft. lbs.).

3. Ignition coil connector and Ignition coil [6]

^

Tighten bolts to 5.8 Nm (4.3 ft. lbs.).

4. Ground cable [5]

^

Tighten bolts to 5.8 Nm (4.3 ft. lbs.).

5. Camshaft angle sensor connector [4]
6. Positive crankcase ventilation valve [3]
7. Exhaust gas recirculation pipe [2]

^

Tighten bolts to: 
-

Exhaust manifold side 28 Nm (21 ft. lbs.).

-

Cylinder head cover side 5.8 Nm (4.3 ft. lbs.).

8. Air cleaner duct assembly [1]

Left Hand Side|Page 1178 > < Left Hand Side